Delay–Cost Analysis for a Section of Baghdad–Kirkuk Highway

Authors

  • Ali J. Kadhim Highway and Transportation Engineering Department, Al-Mustansiriyah University, Baghdad, Iraq Author
  • Atheer N. Hameed Highway and Transportation Engineering Department, Al-Mustansiriyah University, Baghdad, Iraq Author

Keywords:

Delay – cost, Baghdad – Kirkuk highway

Abstract

This study aims to analyzing the delay – cost for a section of Baghdad - Kirkuk highway; this section (16 km length) has a lane width of 10 ft and shoulder width of 4 ft in each direction. The study results show that the average traffic delay for the studied section is (3 minute). The cost resulting from this delay for passengers and freights which had a negative effect on the Gross National Product [G.N.P] is (390,003,982 I.D./year).

Downloads

Key Dates

Published

2011-12-01

How to Cite

Delay–Cost Analysis for a Section of Baghdad–Kirkuk Highway. (2011). Journal of Engineering and Sustainable Development, 15(4), 227-240. https://jeasd.uomustansiriyah.edu.iq/index.php/jeasd/article/view/1321

Similar Articles

1-10 of 1298

You may also start an advanced similarity search for this article.