(1)
Faik Abbas Al-Wakel, S. . IMPROVEMENT OF THE SHORT-TERM STABILITY OF EMBANKMENT ON SOFT SOIL BY USING A GEOSYNTHETIC FABRIC WITH INSTALLED STONE COLUMNS. J. eng. sustain. dev. 2016, 20 (6), 185-194.